Thursday, April 27, 2023

ReadyMontco - Pennsburg Borough Alert

This is a message from ReadyMontco

6th Street is temporarily closed between Main Street and Dotts Street. The road is estimated to reopen around 1:00pm. Residents will be able to access their driveways through West Side Alley.





PLEASE DO NOT REPLY TO THIS MESSAGE

Friday, April 21, 2023

ReadyMontco - West Pottsgrove Alert

This is a message from ReadyMontco

Trash & Recycling Update - Mascaro has placed all trash & recycling toters throughout the Township. If you are missing one or both, please contact the Township at 610-323-7717 or via email at info@westpottsgrove.org. To avoid service issues, everyone should be using their Mascaro toters. Please remember that mattresses and box springs MUST BE WRAPPED IN PLASTIC for collection.





PLEASE DO NOT REPLY TO THIS MESSAGE

ReadyMontco - West Pottsgrove Alert

This is a message from ReadyMontco

Interim Yard Waste Collection Update - Yard waste (branches, leaf debris and/or bundled branches) will be collected on Tuesdays until further notice. Please place items loosely in can or biodegradable paper bags. Contact the Township at 610-323-7717 or via email at info@westpottsgrove.org with your address on or before 3pm on a Monday for collection on Tuesday. NO TRASH.





PLEASE DO NOT REPLY TO THIS MESSAGE

ReadyMontco - Upper Merion Township Emergency Alert

This is a message from ReadyMontco
Please click here to acknowledge receipt of this message

A vehicle crash involving an overturned tractor trailer on the Westbound Schuylkill Expressway (I-76 West) just west of U.S. Route 202 is expected to cause major delays on the highway and on several adjacent local roadways throughout the day.





Click here for more information on this alert.
PLEASE DO NOT REPLY TO THIS MESSAGE

Friday, April 14, 2023

ReadyMontco - Montgomery Township Alert

This is a message from ReadyMontco

The Kenas Rd. Water Main Breaks have been repaired, and water service has resumed to the area.





PLEASE DO NOT REPLY TO THIS MESSAGE

Thursday, April 13, 2023

ReadyMontco - Montgomery Township Alert

This is a message from ReadyMontco

Water Main Break Update: Davis Rd. CLOSED Near Kenas Rd.





PLEASE DO NOT REPLY TO THIS MESSAGE

ReadyMontco - Montgomery Township Alert

This is a message from ReadyMontco

There is a water main break on Kenas Rd., and no water is available at Windlestrae Park. Updates will be provided as they become available.





PLEASE DO NOT REPLY TO THIS MESSAGE

ReadyMontco - Montgomery Township Alert

This is a message from ReadyMontco

There is a water main break on Kenas Rd., and no water is available at Windlestrae Park. Updates will be provided as they become available.





PLEASE DO NOT REPLY TO THIS MESSAGE

Wednesday, April 12, 2023

ReadyMontco - Skippack Township Alert

This is a message from ReadyMontco

PA Dot will be doing roadworks on Rt 73 from Greenhill Rd to Rt. 29.
The work will take place between 7pm and 5am beginning April 14, 2023, and lasting for approximately 3 weeks.

The section of work on Rt 73 between Bridge Rd Rt 113 and Cross Rd will be closed during the hours of 7pm -5am beginning April 18, 2023, thru April 20, 2023. A detour will be in place to assist drivers around the area.





PLEASE DO NOT REPLY TO THIS MESSAGE

Monday, April 3, 2023

ReadyMontco - Upper Dublin Alert

This is a message from ReadyMontco

ROAD CLOSURE UPDATE: Construction on Dreshertown Road has been postponed by PennDOT until Monday, April 10th at 8:00am through Friday, April 14th (weather dependent). Once construction begins, Dreshertown Road will be closed daily between the hours of 8:00am and 3:00pm for construction. Detour signs and traffic control will be set in place. 





PLEASE DO NOT REPLY TO THIS MESSAGE

Sunday, April 2, 2023

ReadyMontco - Upper Dublin Alert

This is a message from ReadyMontco

ROAD CLOSURE ALERT: Dreshertown Road will be closed from Welsh Road to Limekiln Pike - Monday, April 3rd through Friday, April 7th (weather-dependent) from 8am-3pm. PennDOT will be installing two new inlets and a cross pipe. Please follow detour signs until work is complete.





PLEASE DO NOT REPLY TO THIS MESSAGE