Weekday Lane Restrictions Scheduled for Resurfacing Operations in Chester
County
5/4/2018-KING OF PRUSSIA
Daytime lane restrictions are scheduled on Route 472 (Lewisville
Road/Hickory
Hill Road) between Route 841 (Chesterville Road) and Freese Road in Elk and
East Nottingham townships, on Monday, May 7, through Friday, May 11, from
9:00
AM to 3:00 PM, for paving operations, as part of an improvement project to
repair and resurface 26 miles of state highway in Chester County, the
Pennsylvania Department of Transportation (PennDOT) announced today.
Motorists are advised to allow extra time when traveling through the work
zone
because slowdowns will occur. The contractor's schedule is dependent on the
weather.
State highways completed under this resurfacing project include:
• Street Road between the Octoraro Creek Bridge and Homeville Road in Upper
Oxford Township;
• Valley Forge Road between Route 252 (Valley Forge Road) and the
Montgomery
County line in Tredyffrin Township;
• Worthington Road from Newcomen Road to the Uwchlan Township line in West
Pikeland Township;
• Wagontown Road between Lyons Head Drive and Hatfield Road in West Caln
and
West Brandywine townships; and
• Route 340 (West Kings Highway) between Route 10 (Compass Road) and
Business
U.S. 30, in West Caln, West Brandywine, Caln and Valley townships.
Additional state highways scheduled for resurfacing under this contract
include:
• Route 41 (Gap Newport Pike) from the Delaware state line to U.S. 1 in
Avondale Borough and New Garden and London Grove townships;
• Route 52 (Lenape Road) between Route 926 (Street Road) and Lenape
Unionville
Road, in Pennsbury, East Marlborough and Pocopson townships; and
• Main Street/Green Street/Swan Road/Upper Valley Road from Route 372 (Main
Street) to the Atglen Borough line.
Under this improvement project, PennDOT is milling the existing roadway
surface
and repaving the state highways with new asphalt. The new pavement will
seal
the roadways and provide motorists with a smoother riding surface.
Allan A. Myers, LP, of Worcester, Montgomery County, is the general
contractor
on the $6,262,777 project, which is financed with 100 percent state funds
from
Act 89, Pennsylvania's Transportation Plan.
Work on the entire project is expected to be completed this summer.
For more information on projects occurring or being bid this year, those
made
possible by or accelerated by Act 89, or those on the department's Four and
Twelve Year Plans, visit www.projects.penndot.gov.
A list of weekly road restrictions and PennDOT maintenance operations in
the
five-county Philadelphia region is available by visiting the District 6
Traffic
Bulletin at www.penndot.gov/District6.
Motorists can check conditions on more than 40,000 roadway miles, including
color-coded winter conditions on 2,900 miles, by visiting www.511PA.com.
511PA,
which is free and available 24 hours a day, provides traffic delay
warnings,
weather forecasts, traffic speed information, and access to more than 850
traffic cameras.
511PA is also available through a smartphone application for iPhone and
Android
devices, by calling 5-1-1, or by following regional twitter alerts
accessible
on the 511PA website.
For more PennDOT information, visit www.penndot.gov. Follow local PennDOT
information on Twitter at www.twitter.com/511PAPhilly, and follow the
department on Facebook at
www.facebook.com/pennsylvaniadepartmentoftransportation and Instagram at
www.instagram.com/pennsylvaniadot.
To view a complete list of District 6 News Releases: Click
http://www.penndot.gov/RegionalOffices/district-6/Pages/allnews.aspx
To unsubscribe click
http://www.dot.state.pa.us/penndot/districts/district6/d6media.nsf/unsubscribeform?OpenForm
No comments:
Post a Comment