Friday, June 8, 2018

U.S. 1 North and South Nighttime Travel Restrictions Scheduled for Safety Improvement Project in Bucks County

U.S. 1 North and South Nighttime Travel Restrictions Scheduled for Safety
Improvement Project in Bucks County

6/8/2018-KING OF PRUSSIA

Motorists traveling northbound and southbound on U.S. 1 in Bucks County
will
encounter nighttime lane restrictions next week for construction activities

related to a project to enhance travel and safety on northbound U.S. 1
through
the interchange with U.S. 13 (Bristol Pike) and Route 32 in Falls,
Middletown
and Lower Makefield townships, the Pennsylvania Department of
Transportation
(PennDOT) announced today.

The work schedule is:

• Monday, June 11, through Friday, June 15, from 7:00 PM to 5:00 AM, lane
closures are scheduled on southbound U.S. 1 between the
Morrisville/Pennsylvania Avenue and U.S. 13 (Bristol Pike) interchanges for

placement of a high-friction surface treatment; and
• Monday, June 11, through Friday, June 15, from 8:00 PM to 5:00 AM, lane
closures are scheduled on northbound and southbound U.S. 1 between the
Oxford
Valley Road and Morrisville/Pennsylvania Avenue interchanges for overhead
sign
replacement.

Motorists are advised to allow extra time when traveling through the work
zones
because slowdowns will occur during construction. All scheduled activities
are
weather dependent.

When completed, this project will improve U.S. 1 by providing northbound
motorists two through lanes while maintaining an exit to Route 32, thereby
removing the "exit only" lane that currently exists for northbound drivers
at
this interchange. In addition, a concrete barrier will be placed between
U.S. 1
north and the on-ramp from U.S. 13 to eliminate the substandard weave
condition
that currently exists when U.S. 13 (Bristol Pike) drivers enter U.S. 1 and
weave through traffic to reach the Route 32 exit ramp.

The scope of the project also includes placement of a high-friction surface

treatment on U.S. 1 south in the area of Route 32. Construction of an
additional auxiliary lane along northbound U.S. 1 at Oxford Valley Road has

already been completed under this project.

James D. Morrissey, Inc. of Philadelphia is the general contractor on the
$2,327,110 project, which is financed with 100 percent federal funds.
Construction is expected to be completed this summer.

For more information on projects occurring or being bid this year, those
made
possible by or accelerated by Act 89, or those on the department's Four and

Twelve Year Plans, visit www.projects.penndot.gov.

A list of weekly road restrictions and PennDOT maintenance operations in
the
five-county Philadelphia region is available by visiting the District 6
Traffic
Bulletin at www.penndot.gov/District6.

Motorists can check conditions on more than 40,000 roadway miles by
visiting
www.511PA.com. 511PA, which is free and available 24 hours a day, provides
traffic delay warnings, weather forecasts, traffic speed information and
access
to more than 860 traffic cameras.

511PA is also available through a smartphone application for iPhone and
Android
devices, by calling 5-1-1, or by following regional Twitter alerts
accessible
on the 511PA website.

For more PennDOT information, visit www.penndot.gov. Follow local PennDOT
information on Twitter at www.twitter.com/511PAPhilly, and follow the
department on Facebook at
www.facebook.com/pennsylvaniadepartmentoftransportation and Instagram at
www.instagram.com/pennsylvaniadot.

To view a complete list of District 6 News Releases: Click
http://www.penndot.gov/RegionalOffices/district-6/Pages/allnews.aspx

To unsubscribe click
http://www.dot.state.pa.us/penndot/districts/district6/d6media.nsf/unsubscribeform?OpenForm

No comments:

Post a Comment