Thursday, September 12, 2024

ReadyMontco - Upper Merion Twp Alert

This is a message from ReadyMontco

Upper Merion Township will perform storm sewer pipe lining in the Smith Farms section of the township starting Monday, September 16. The project is expected to be completed within a week, weather permitting. Some equipment and vehicles will remain on-site throughout the project.
This method of pipe replacement allows the existing storm pipes to be reformed without the costly expense and inconvenience of digging up the roads.





PLEASE DO NOT REPLY TO THIS MESSAGE. To change your preferences, login. Download the Everbridge app on iOS or Android.

No comments:

Post a Comment