.Red Hill trash/recycling pickup will occur on Friday, June 2nd, due to the Memorial Day Holiday. Please remember to have your containers to the curb by 7:00 AM Friday. Thank you.
Wednesday, May 31, 2023
Red Hill - Trash/Recycling pickup are Friday due to the Memorial Day Holiday
This is a message from ReadyMontco
Please click here to acknowledge receipt of this message
PLEASE DO NOT REPLY TO THIS MESSAGE
Tuesday, May 30, 2023
ReadyMontco - Skippack Township Alert
This is a message from ReadyMontco
BURN BAN IN EFFECT - Due to the extremely dry conditions, a burn ban is in effect in Skippack Township until further notice. Please restrict open burning and the use of fireworks of any kind, as these could also pose a threat.
PLEASE DO NOT REPLY TO THIS MESSAGE
ReadyMontco - West Pottsgrove Alert
This is a message from ReadyMontco
West Pottsgrove Township will be hosting a Spring Community Day - Clean Up Our Parks - on Saturday, June 3, 2023 (weather permitting) from 9 am to 12 Noon. Please reach out to the Township at 610-323-7717 or via email at info@westpottsgrove.org if you are interested in volunteering.
PLEASE DO NOT REPLY TO THIS MESSAGE
ReadyMontco - West Pottsgrove Alert
This is a message from ReadyMontco
Reminder - Due to the Memorial Day holiday, Trash & Recycling collection will be moved to Thursday June 1, 2023.
PLEASE DO NOT REPLY TO THIS MESSAGE
Thursday, May 25, 2023
ReadyMontco - West Pottsgrove Alert
This is a message from ReadyMontco
Township building will be closed on Monday May 29, 2023, for the Memorial Day holiday - summer hours begin on Tuesday May 30, 2023, and will run through Labor Day.
PLEASE DO NOT REPLY TO THIS MESSAGE
Wednesday, May 24, 2023
ReadyMontco - West Pottsgrove Alert
This is a message from ReadyMontco
West Pottsgrove Township will be hosting a Spring Community Day - Clean Up Our Parks - on Saturday, June 3, 2023 (weather permitting) from 9 am to 12 Noon. Please reach out to the Township at 610-323-7717 or via email at info@westpottsgrove.org if you are interested in volunteering.
PLEASE DO NOT REPLY TO THIS MESSAGE
ReadyMontco - West Pottsgrove Alert
This is a message from ReadyMontco
Reminder - Due to the Memorial Day holiday, Trash & Recycling collection will be moved to Thursday June 1, 2023.
PLEASE DO NOT REPLY TO THIS MESSAGE
Tuesday, May 23, 2023
Red Hill - 2023 Street Sweeping May 24th & 25th 7 AM-5 PM
This is a message from ReadyMontco
Please click here to acknowledge receipt of this message
Red Hill Street Sweeping will occur tomorrow, May 24 & Thursday, May 25 from 7 a.m. - 5 p.m. Please move cars and other items from the roadway the morning of the street sweeping. Vehicles creating an obstruction may be TOWED. We thank you for your cooperation.
PLEASE DO NOT REPLY TO THIS MESSAGE
Sunday, May 21, 2023
ReadyMontco - Upper Dublin Alert
This is a message from ReadyMontco
CAMP HILL ROAD CLOSURE - STAGE 1
On Monday, May 22nd starting at approximately 9:00am, Camp Hill Road will be closed for Stage 1 (of 2) of construction which will last for approximately ten (10) days. There will be no construction on Memorial Day. Stage 1 work will take place on Camp Hill Road between Virginia Drive and Highland Avenue.
Detour signs will be placed to help guide motorists around the closure and will be removed once construction is completed. The alternate route for Stage 1 will direct motorists to turn from Camp Hill Road onto Virginia Drive, Pinetown Road, and Highland Avenue. Turns onto Virginia Drive from Camp Hill Road will be temporarily permitted, and the "No Turn" signs will be covered accordingly.
Once Stage 1 is complete, Stage 2 will begin, and the detour will change at that time (be on the lookout for a follow-up notification with further details on Stage 2).
Stage 1 and 2 will last a total of three weeks and is expected to be completed on, or before Friday, June 9th. Construction will include minor widening of Camp Hill Road and two intersection corners to provide better turning radii for the upcoming signalized intersection condition.
Virginia Drive will remain open at all times, and access to the Upper Dublin Police Department and Public Library will remain open from the Virginia Drive, Pinetown Road and Highland Avenue driveways.
Traffic delays are expected during construction and motorists should allow for extra time if traveling in the area or seek an alternate route. Thank you for your patience and understanding.
On Monday, May 22nd starting at approximately 9:00am, Camp Hill Road will be closed for Stage 1 (of 2) of construction which will last for approximately ten (10) days. There will be no construction on Memorial Day. Stage 1 work will take place on Camp Hill Road between Virginia Drive and Highland Avenue.
Detour signs will be placed to help guide motorists around the closure and will be removed once construction is completed. The alternate route for Stage 1 will direct motorists to turn from Camp Hill Road onto Virginia Drive, Pinetown Road, and Highland Avenue. Turns onto Virginia Drive from Camp Hill Road will be temporarily permitted, and the "No Turn" signs will be covered accordingly.
Once Stage 1 is complete, Stage 2 will begin, and the detour will change at that time (be on the lookout for a follow-up notification with further details on Stage 2).
Stage 1 and 2 will last a total of three weeks and is expected to be completed on, or before Friday, June 9th. Construction will include minor widening of Camp Hill Road and two intersection corners to provide better turning radii for the upcoming signalized intersection condition.
Virginia Drive will remain open at all times, and access to the Upper Dublin Police Department and Public Library will remain open from the Virginia Drive, Pinetown Road and Highland Avenue driveways.
Traffic delays are expected during construction and motorists should allow for extra time if traveling in the area or seek an alternate route. Thank you for your patience and understanding.
For detour maps and more information, please click here.
PLEASE DO NOT REPLY TO THIS MESSAGE
Saturday, May 20, 2023
ReadyMontco - Upper Dublin:
This is a message from ReadyMontco
On Sunday, May 21st from 7:00am to 11:00am Southbound Camp Hill Road between Highland Avenue and Virginia Drive will be temporarily closed for the Upper Dublin Triathlon. Traffic control will be set in place. Southbound Camp Hill Road will reopen after 11:00am and normal traffic flow will resume.
PLEASE DO NOT REPLY TO THIS MESSAGE
Red Hill - Branch Collection on May 22, 2023
This is a message from ReadyMontco
Please click here to acknowledge receipt of this message
Red Hill Branch collection is on Monday, May 22nd. Trimmings must be at your trash pick-up site by 7 a.m. The truck is only permitted 10 minutes at any locations, so they will not wait and will not come back. The bottom of the trimmings must face the direction of traffic and can be no wider than 4" in diameter. Yard waste is not permitted.
PLEASE DO NOT REPLY TO THIS MESSAGE
Friday, May 19, 2023
ReadyMontco - Upper Merion Township - PennDOT Announced Road Construction Activities for Next Week Alert
This is a message from ReadyMontco
Sunday, May 21, from 5:00 PM to 5:00 AM the following morning, a lane closure is scheduled on Route 23 (Valley Forge Road/Fourth Street/River Road/Front Street) between Geerdes Boulevard and Matsonford Road in Upper Merion Township and Bridgeport and West Conshohocken boroughs for milling and paving.
Monday, May 22, through Friday, May 26, from 9:00 AM to 3:00 PM, a lane closure is scheduled on Route 23 (Valley Forge Road/Fourth Street/River Road/Front Street) between Geerdes Boulevard and Matsonford Road in Upper Merion Township and Bridgeport and West Conshohocken boroughs for utility adjustments.
Monday, May 22, through Friday, May 26, from 6:00 PM to 6:00 AM the following morning, a lane closure is scheduled on Route 23 (Valley Forge Road/Fourth Street/River Road/Front Street) between Geerdes Boulevard and Matsonford Road in Upper Merion Township and Bridgeport and West Conshohocken boroughs for milling and paving.
Monday, May 22, from 9:00 AM to 3:00 PM, a right lane closure is scheduled on southbound U.S. 202 (Dekalb Pike) between the Route 23 (Valley Forge Road) and the U.S. 202 (Dekalb Street) interchanges in Upper Merion Township for bridge inspection.
Monday, May 22, through Friday, May 26, from 9:00 AM to 3:00 PM, a lane closure is scheduled on Route 23 (Valley Forge Road/Fourth Street/River Road/Front Street) between Geerdes Boulevard and Matsonford Road in Upper Merion Township and Bridgeport and West Conshohocken boroughs for utility adjustments.
Monday, May 22, through Friday, May 26, from 6:00 PM to 6:00 AM the following morning, a lane closure is scheduled on Route 23 (Valley Forge Road/Fourth Street/River Road/Front Street) between Geerdes Boulevard and Matsonford Road in Upper Merion Township and Bridgeport and West Conshohocken boroughs for milling and paving.
Monday, May 22, from 9:00 AM to 3:00 PM, a right lane closure is scheduled on southbound U.S. 202 (Dekalb Pike) between the Route 23 (Valley Forge Road) and the U.S. 202 (Dekalb Street) interchanges in Upper Merion Township for bridge inspection.
PLEASE DO NOT REPLY TO THIS MESSAGE
Wednesday, May 17, 2023
ReadyMontco - Upper Dublin Alert
This is a message from ReadyMontco
CLOSURE UPDATE 5/17/23 4:16pm: Twining Road will continue to be closed between Ary Lane & Dale Road for an extended period of time as power lines are repaired. Please seek alternate route as rush hour begins.
ROAD CLOSURE ALERT - ACCIDENT: Twining Road is temporarily closed both North Bound & South Bound between Ayr Lane and Dale Road due to an accident involving downed wires. Please seek an alternate route while traveling in the area. Crews are working to clear the accident and will reopen the road as soon as possible.
ROAD CLOSURE ALERT - ACCIDENT: Twining Road is temporarily closed both North Bound & South Bound between Ayr Lane and Dale Road due to an accident involving downed wires. Please seek an alternate route while traveling in the area. Crews are working to clear the accident and will reopen the road as soon as possible.
PLEASE DO NOT REPLY TO THIS MESSAGE
ReadyMontco - Skippack Township Alert
This is a message from ReadyMontco
Fire at Univest Bank on Township Line Road and 113. Please be aware if traveling through the area.
PLEASE DO NOT REPLY TO THIS MESSAGE
ReadyMontco - Upper Dublin Alert
This is a message from ReadyMontco
ROAD CLOSURE ALERT: Twining Road is temporarily closed both North Bound & South Bound between Ayr Lane and Dale Road due to an accident involving downed wires. Please seek an alternate route while traveling in the area. Crews are working to clear the accident and will reopen the road as soon as possible.
PLEASE DO NOT REPLY TO THIS MESSAGE
Friday, May 12, 2023
ReadyMontco - Upper Dublin Alert
This is a message from ReadyMontco
ROAD CLOSURE ALERT: On Saturday, May 13th starting at 6:00am, Virginia Drive will be closed for construction until 8:00pm (or until work is complete) to remove old and install new large sections of drainage piping which crosses the road. Work will take place at 440 Virginia Drive (Lightbridge Academy) between Delaware Drive and the Public Library.
Detour signs will be placed to help guide motorists around the closure and will be removed once construction is completed. The alternate route will direct motorists to turn from Virginia Drive onto Camp Hill Road (temporarily permitted for detour), Highland Avenue and Pinetown Road to avoid the closure.
Access to the Upper Dublin Police Department and Public Library will remain open on Virginia Drive if coming from Camp Hill Road and will still be accessible from the Pinetown Road and Highland Avenue driveways.
Traffic delays are expected during construction and motorists should allow for extra time if traveling in the area or seek an alternate route. Thank you for your patience and understanding.
Detour signs will be placed to help guide motorists around the closure and will be removed once construction is completed. The alternate route will direct motorists to turn from Virginia Drive onto Camp Hill Road (temporarily permitted for detour), Highland Avenue and Pinetown Road to avoid the closure.
Access to the Upper Dublin Police Department and Public Library will remain open on Virginia Drive if coming from Camp Hill Road and will still be accessible from the Pinetown Road and Highland Avenue driveways.
Traffic delays are expected during construction and motorists should allow for extra time if traveling in the area or seek an alternate route. Thank you for your patience and understanding.
PLEASE DO NOT REPLY TO THIS MESSAGE
Wednesday, May 10, 2023
ReadyMontco - West Pottsgrove Alert
This is a message from ReadyMontco
It has been brought to our attention that Power Windows is soliciting in the Township. They do not have permission to do so. No permit has been issued, and IDs have not been verified as required - so please use caution if they approach your home.
PLEASE DO NOT REPLY TO THIS MESSAGE
ReadyMontco - Pennsburg Borough Alert
This is a message from ReadyMontco
Pennsburg Borough Street sweeping will take place Thursday and Friday, rain or shine, between 7:00am and 4:30pm. ***Cars must be removed from the streets no later than 6:30am on the date of your sweeping.***
Thursday, May 11th:
Main St, Penn St, Dotts St, Railroad St, Washington St, Montgomery Ave, Cherry St, Lake Ln, Lakeview Terrace, Shirley Ln, Seminary St, Cattail Ct, Jackson St, Hunter Dr, Macoby Creek Way, Macoby St & Jodie Ct
Friday, May 12th:
2nd St, 3rd St, 4th St, 5th St, 6th St, 7th St, 8th St,10th St, 11th St, Front St, Route 663, Daisy Ln, Meadow Ln, Thistle Dr & Honeysuckle Way
Thursday, May 11th:
Main St, Penn St, Dotts St, Railroad St, Washington St, Montgomery Ave, Cherry St, Lake Ln, Lakeview Terrace, Shirley Ln, Seminary St, Cattail Ct, Jackson St, Hunter Dr, Macoby Creek Way, Macoby St & Jodie Ct
Friday, May 12th:
2nd St, 3rd St, 4th St, 5th St, 6th St, 7th St, 8th St,10th St, 11th St, Front St, Route 663, Daisy Ln, Meadow Ln, Thistle Dr & Honeysuckle Way
PLEASE DO NOT REPLY TO THIS MESSAGE
Monday, May 8, 2023
ReadyMontco - West Pottsgrove Alert
This is a message from ReadyMontco
Solicitation Permit - The Township has issued a solicitation permit for Eco Shield Pest Solutions. They will be in the township starting May 8th through May 13th, 2023. All representatives have ID as required. Reach out to the Township with any questions.
PLEASE DO NOT REPLY TO THIS MESSAGE
Friday, May 5, 2023
ReadyMontco - West Pottsgrove Alert
This is a message from ReadyMontco
Attention Residents - South Grosstown Road between High Street and Old Reading Pike will be closed between the hours of 9 am and 2 pm on Monday May 8th, 2023, for roadway maintenance.
PLEASE DO NOT REPLY TO THIS MESSAGE
ReadyMontco - Pennsburg Borough Alert
This is a message from ReadyMontco
Pennsburg Borough Street sweeping will take place Thursday and Friday next week, rain or shine, between 7:00am and 4:00pm. Cars must be removed from the streets no later than 6:30am on the date of your sweeping.
Thursday, May 11th:
Main St, Penn St, Dotts St, Railroad St, Washington St, Montgomery Ave, Cherry St, Lake Ln, Lakeview Terrace, Shirley Ln, Seminary St, Cattail Ct, Jackson St, Hunter Dr, Macoby Creek Way, Macoby St & Jodie Ct
Friday, May 12th:
2nd St, 3rd St, 4th St, 5th St, 6th St, 7th St, 8th St,10th St, 11th St, Front St, Route 663, Daisy Ln, Meadow Ln, Thistle Dr & Honeysuckle Way
Thursday, May 11th:
Main St, Penn St, Dotts St, Railroad St, Washington St, Montgomery Ave, Cherry St, Lake Ln, Lakeview Terrace, Shirley Ln, Seminary St, Cattail Ct, Jackson St, Hunter Dr, Macoby Creek Way, Macoby St & Jodie Ct
Friday, May 12th:
2nd St, 3rd St, 4th St, 5th St, 6th St, 7th St, 8th St,10th St, 11th St, Front St, Route 663, Daisy Ln, Meadow Ln, Thistle Dr & Honeysuckle Way
PLEASE DO NOT REPLY TO THIS MESSAGE
Thursday, May 4, 2023
ReadyMontco - Pottstown Alert
This is a message from ReadyMontco
High Street will be closed from Manatawny Street to Evans Street and Hanover Street from King Street to South Street on Saturday, May 6, 2023, 3 pm to 9 pm for the Red Horse Motoring Club Car Show.
PLEASE DO NOT REPLY TO THIS MESSAGE
Tuesday, May 2, 2023
ReadyMontco - Upper Dublin Alert
This is a message from ReadyMontco
Beginning Wednesday, May 3rd at 7:00am, Foxbury Road will be partially closed due to slip line repairs. Work will take place from Lexington Drive to approximately 1520 Foxbury Road. Construction will occur daily (up to five days) from 7:00am to 7:00pm through Monday, May 8th.
Signage and traffic control will be set in place to help guide motorists around the closure. Please follow traffic guides accordingly. All residents will have full access to their homes.
Signage and traffic control will be set in place to help guide motorists around the closure. Please follow traffic guides accordingly. All residents will have full access to their homes.
PLEASE DO NOT REPLY TO THIS MESSAGE