Wednesday, November 23, 2016

Travel Restrictions Next Week on U.S. 422 in Chester County

Travel Restrictions Next Week on U.S. 422 in Chester County

11/23/2016-KING OF PRUSSIA

The right lane is scheduled to close periodically on eastbound and
westbound
U.S. 422 between the U.S. 202 and First Avenue interchanges in Tredyffrin
Township, Chester County, on Monday, November 28, through Thursday,
December 1,
from 11:00 AM to 1:00 PM, for conduit installation, the Pennsylvania
Department
of Transportation (PennDOT) said today.

Motorists are advised to allow additional time for travel on U.S. 422
during
this operation because slowdowns may occur. The contractor's work schedule
is
dependent on the weather.

The operations are part of PennDOT's $97.4 million project to build new,
wider
structures to improve travel on U.S. 422 at its crossings over the
Schuylkill
River, Norfolk Southern Railroad, South Trooper Road and the Schuylkill
River
Trail. The project also includes improving U.S. 422 between the Route 23
(Valley Forge Road) and Route 363 (Trooper Road) interchanges; upgrading
Route
23 (Valley Forge Road) at its interchange with U.S. 422; and improving
ramps at
the Route 363 (Trooper Road), Route 23 (Valley Forge Road) and First Avenue

interchanges.

PennDOT began construction on this transportation improvement project in
February 2016 and the project is scheduled to finish in May 2020. Without
the
passage of Act 89, Pennsylvania's transportation plan, construction on this

project would not have begun before 2018.

J.D. Eckman, Inc. of Atglen, Chester County, is the general contractor on
the
$97,380,711 contract, which is financed with 80 percent federal and 20
percent
state funds.

For additional information on U.S. 422 improvement projects, visit
www.422improvements.com.

Motorists can check conditions on more than 40,000 roadway miles by
visiting
www.511PA.com. 511PA, which is free and available 24 hours a day, provides
traffic delay warnings, weather forecasts, traffic speed information and
access
to more than 770 traffic cameras.

511PA is also available through a smartphone application for iPhone and
Android
devices, by calling 5-1-1, or by following regional Twitter alerts
accessible
on the 511PA website.

For more PennDOT information, visit www.penndot.gov. Follow local PennDOT
Information on Twitter at www.twitter.com/511PAPhilly, and follow the
department on Facebook at
www.facebook.com/pennsylvaniadepartmentoftransportation and Instagram at
www.instagram.com/pennsylvaniadot.

To view a complete list of District 6 News Releases: Click
http://www.penndot.gov/RegionalOffices/district-6/Pages/allnews.aspx

To unsubscribe click
http://www.dot.state.pa.us/penndot/districts/district6/d6media.nsf/unsubscribeform?OpenForm

Tuesday, November 22, 2016

Weekly Announcements for November 22, 2016

This is a message from ReadyChesco.


Please click to view the Weekly Announcements from the Chester County Department of Emergency Services

 
 
Use the links above to confirm/respond to the message. Do not reply directly to this email.  This is being sent from an un-monitored account.

Update your preferences and information you receive at www.ReadyChesco.org

Brookhaven Road Lane Closure Scheduled Next Week for Bridge Seal Replacement in Delaware County

Brookhaven Road Lane Closure Scheduled Next Week for Bridge Seal
Replacement in Delaware County

11/22/2016-KING OF PRUSSIA

Brookhaven Road will be reduced to a single lane between Waterville Road
and
Creekside Drive in Brookhaven Borough, Delaware County, on Monday, November
28,
and Tuesday, November 29, from 9:00 AM to 3:00 PM, for bridge seal
replacement,
the Pennsylvania Department of Transportation (PennDOT) announced today.
Traffic will be controlled by flagging.

Motorists are advised to allow extra time when traveling through the area.
The
work schedule is weather dependent.

The Brookhaven Road bridge was built in 1964. The single-span steel I-beam
bridge is 70 feet long, 43 feet wide and carries an average of 18,755
vehicles
a day.

Loftus Construction, Inc. of Cinnaminson, N.J., is the general contractor
on
the project, which is financed with 100 percent state funds.

Motorists can check conditions on more than 40,000 roadway miles by
visiting
www.511PA.com. 511PA, which is free and available 24 hours a day, provides
traffic delay warnings, weather forecasts, traffic speed information and
access
to more than 770 traffic cameras.

511PA is also available through a smartphone application for iPhone and
Android
devices, by calling 5-1-1, or by following regional twitter alerts
accessible
on the 511PA website.

For more PennDOT information, visit www.penndot.gov. Follow Local PennDOT
Information on Twitter at www.twitter.com/511PAPhilly, and follow the
department on Facebook at
www.facebook.com/pennsylvaniadepartmentoftransportation and Instagram at
www.instagram.com/pennsylvaniadot.

To view a complete list of District 6 News Releases: Click
http://www.penndot.gov/RegionalOffices/district-6/Pages/allnews.aspx

To unsubscribe click
http://www.dot.state.pa.us/penndot/districts/district6/d6media.nsf/unsubscribeform?OpenForm

Public Meeting Planned for Route 420 (Kedron Avenue) Bridge Project in Ridley Township

Public Meeting Planned for Route 420 (Kedron Avenue) Bridge Project in
Ridley Township

11/22/2016-KING OF PRUSSIA

The community is invited to a public meeting regarding the replacement of
the
Route 420 (Kedron Avenue) bridge, which spans Stony Creek, in Ridley
Township,
Delaware County, as part of the Pennsylvania Department of Transportation's

(PennDOT) Rapid Bridge Replacement Project. The meeting will be focused on
important information including the construction schedule and traffic
changes
that are planned to take effect while the bridge is being replaced.

Outlined below are details of the bridge to be replaced and the public
meeting.

Bridge: Route 420 (Kedron Avenue) bridge over Stony Creek in Ridley
Township, Delaware County

Meeting
Location: Ridley Township Building, 100 E. MacDade Boulevard, Folsom, PA

19033

Meeting
Date: Tuesday, November 29, 2016 from 6 – 8 p.m.

A presentation will be given at the start of the meeting. Following,
representatives from Plenary Walsh Keystone Partners will be available to
discuss the bridge projects and answer questions. Construction plans will
be on
display for reference.

A letter announcing the start of construction will be mailed out two weeks
in
advance to all project stakeholders. You will be given the opportunity to
sign-up as a project stakeholder the night of the meeting.

This bridge is one of 558 bridges being replaced under the Rapid Bridge
Replacement

These bridge replacements are part of the Rapid Bridge Replacement Project,
a
public-private partnership (P3) between PennDOT and Plenary Walsh Keystone
Partners (PWKP), under which PWKP will finance, design, replace and
maintain
the bridges for 25 years. The P3 approach allows PennDOT to replace the
bridges
more quickly, while achieving significant savings and minimizing impact on
motorists.

To view the bridges included in the statewide initiative and to learn more
about the Rapid Bridge Replacement Project and P3 in Pennsylvania, visit
www.p3forpa.pa.gov. Additional information on the project, the team and how
to
bid on the project can be found at www.parapidbridges.com.

Requests for special needs or accommodations to aid public participation at

this facility should be directed to Rory McGlasson at 412-500-6695.

Media contact: Plenary Walsh Keystone Partners: Rory McGlasson,
412-500-6695.

To view a complete list of District 6 News Releases: Click
http://www.penndot.gov/RegionalOffices/district-6/Pages/allnews.aspx

To unsubscribe click
http://www.dot.state.pa.us/penndot/districts/district6/d6media.nsf/unsubscribeform?OpenForm

Monday, November 21, 2016

Wind Advisory Is No Longer In Effect

Please click here to acknowledge receipt of this message

This is a message from ReadyChesco.


A Wind Advisory is no longer in effect for your area. For more info: www.weather.gov/phi/

 
 
Use the links above to confirm/respond to the message. Do not reply directly to this email.  This is being sent from an un-monitored account.

Update your preferences and information you receive at www.ReadyChesco.org

I-676 to Close at Night Next Week in Philadelphia for Bridge Construction

I-676 to Close at Night Next Week in Philadelphia for Bridge Construction

11/21/2016-KING OF PRUSSIA

Interstate 676 will be closed and detoured in both directions between the
Interstate 76 and Broad Street (Route 611) interchanges in Philadelphia on
Monday, November 28, through Thursday, December 1, from 11:00 PM to 5:00 AM
the
following morning for overhead bridge construction, the Pennsylvania
Department
of Transportation (PennDOT) said today.

The overnight operation is part of the four-year, $64.8 million project to
replace seven structurally deficient bridges over I-676 between 22nd Street
and
18th Street, and to make landscaping and streetscape improvements above the

expressway. Construction began in April 2015 and will finish in November
2018,
a year ahead of schedule.

Crews will work overnight to remove one half of the 22nd Street and 21st
Street
bridges over I-676. The contractor's work schedule is weather dependent.

When I-676 east is closed, the following detours will be in place:

• From I-76 east: Exit at 30th Street/Market Street (Exit 345); right at
Arch
Street; left at 30th Street; left at Market Street; left at 16th Street;
right
at Vine Street to the ramp to I-676 east;
• From I-76 west: Exit at 30th Street (Exit 345); take Schuylkill Avenue to

Market Street; right at Market Street; left at 16th Street; right at Vine
Street to the ramp to I-676 east; and
• Traveling east on Benjamin Franklin Parkway intending to use the 24th
Street
on-ramp: Follow Benjamin Franklin Parkway around Logan Circle and bear
right
onto Vine Street east; follow Vine Street to the ramp to I-676 east.

When I-676 west is closed, the following detours will be in place for
passenger
cars and trucks to follow:

• To I-76 East and West: Exit I-676 west at Broad Street (Route 611)
Interchange; take 15th Street south; right on J.F.K. Boulevard; right on
Schuylkill Avenue and follow signs to I-76 east and I-76 west;
• From 16th Street north of J.F.K. Boulevard: Follow 16th Street north;
right
at Spring Garden Street; right at 15th Street; right at J.F.K. Boulevard;
right
on Schuylkill Avenue to ramps to I-76 east and I-76 west; and
• From 16th Street south of J.F.K. Boulevard: Follow 16th Street north;
left at
J.F.K. Boulevard; right on Schuylkill Avenue to ramps to I-76 east and I-76

west.

Optional detours for passenger cars during the closure of I-676 west
include:

• To I-76 West: Exit I-676 west at Broad Street (Route 611) Interchange;
take
15th Street south; right onto local Vine Street; right on Benjamin Franklin

Parkway and follow around Eakins Oval and onto Spring Garden Street to the
ramp
to I-76 west; and
• From 16th Street north of J.F.K Boulevard to I-76 West: Follow 16th
Street
north; left onto local Vine Street; right on Benjamin Franklin Parkway and
follow around Eakins Oval and onto Spring Garden Street to the ramp to I-76

west.

PennDOT's contractor is currently working to build new bridges above I-676
at
the former Family Court building, Free Library, 19th Street, Benjamin
Franklin
Parkway/20th Street, 21st Street and 22nd Street. Work on the 18th Street
bridge is scheduled to start in 2017.

Buckley & Company, Inc. of Philadelphia is the general contractor on the
$64,836,180 project. Construction is financed with 100 percent federal
funds.

For more information on the I-676 project, visit www.bridgesover676.com.

Motorists can check conditions on more than 40,000 roadway miles by
visiting
www.511PA.com. 511PA, which is free and available 24 hours a day, provides
traffic delay warnings, weather forecasts, traffic speed information and
access
to more than 770 traffic cameras.

511PA is also available through a smartphone application for iPhone and
Android
devices, by calling 5-1-1, or by following regional Twitter alerts
accessible
on the 511PA website.

For more PennDOT information, visit www.penndot.gov. Follow local PennDOT
Information on Twitter at www.twitter.com/511PAPhilly, and follow the
department on Facebook at
www.facebook.com/pennsylvaniadepartmentoftransportation and Instagram at
www.instagram.com/pennsylvaniadot.

To view a complete list of District 6 News Releases: Click
http://www.penndot.gov/RegionalOffices/district-6/Pages/allnews.aspx

To unsubscribe click
http://www.dot.state.pa.us/penndot/districts/district6/d6media.nsf/unsubscribeform?OpenForm

PennDOT Alert: College Ave detour in Haverford Twp

This is a message from Delco Alert


PennDOT to Replace Structurally-Deficient College Avenue Bridge in Haverford Township, Delaware County
 
King of Prussia, PA - Construction is scheduled to begin Tuesday, November 29, on a $5.2 million project to replace the structurally-deficient College Avenue bridge over SEPTA railroad tracks and the adjacent culvert over Cobbs Creek in Haverford Township, Delaware County, the Pennsylvania Department of Transportation (PennDOT) today announced.
 
PennDOT's contractor will work over the next year to replace the two-span concrete encased steel beam bridge with a one-span composite pre-stressed concrete box beam structure and construct a new precast reinforced concrete arch culvert. The project is scheduled to finish in November 2017.
                      
The project also includes improvements to the traffic signals at the intersection of College Avenue and Haverford Road, and the addition of left turn lanes on College Avenue at this intersection.
 
During construction, College Avenue will be closed and detoured. Motorists will follow Cooperstown Road, Ardmore Avenue and Haverford Avenue to travel around the bridge closure.
 
The new structure over SEPTA tracks will be 42 feet wide and 58 feet long. It will have two 11-foot travel lanes and a 10-foot left turn lane. It will also have a five-foot shoulder on the west side of the structure and two-foot shoulder on the east side.
 
The new concrete arch culvert will be 42 feet wide and 24 feet long. It will have two 11-foot travel lanes and a 10-foot painted center gore area. It will also feature a five-foot shoulder on the west side of the structure and two-foot shoulder on the east side.
 
The existing two-span bridge over SEPTA was built in 1931. It is 42 feet wide and 63 feet long. The structure carries an average of 4,637 vehicles a day. The one-span concrete arch culvert over Cobbs Creek was built in 1924. It is 30 feet wide and 16 feet long.
 
Road-Con, Inc. of West Chester, Chester County, is the general contractor on the $5,240,145 project that is financed with 100 percent state funds. 


 
 
DO NOT REPLY TO THIS MESSAGE, IF REQUESTED, CONFIRM AT THE LINK ABOVE