Friday, July 15, 2016

Intermittent Traffic Stoppages Next Week on Passyunk Avenue in Philadelphia

Intermittent Traffic Stoppages Next Week on Passyunk Avenue in Philadelphia

7/15/2016-KING OF PRUSSIA

Intermittent traffic stoppages are scheduled on Passyunk Avenue between
61st
Street and 28th Street in Philadelphia on Monday, July 18, through
Thursday,
July 21, from 9:00 AM to 3:00 PM for drawbridge testing on the Honorable
Robert
C. Donatucci Memorial Bridge, the Pennsylvania Department of Transportation

(PennDOT) today announced. Several traffic stoppages will occur during this

operation.

The work is part of PennDOT's two-year, $33.5 million project to
rehabilitate
and improve the drawbridge over the Schuylkill River in Philadelphia.

The 33-year-old bridge is undergoing construction to enhance the
drawbridge's
mechanical operation and structural condition. PennDOT's contractor is
upgrading the drawbridge by rehabilitating the motors, brakes, locks and
gears,
plus the electrical power, controls, traffic control systems and gates.

Construction crews also will repair and paint structural steel, replace
deteriorated concrete, overlay the bridge deck with latex concrete, replace

expansion joints, reset rocker bearings, repair pedestrian railings, and
clean
and repair the drainage systems.

Currently, the bridge carries three westbound and three eastbound travel
lanes,
and two sidewalks. At the end of construction, the bridge will carry two
westbound and two eastbound travel lanes, two sidewalks, and two
13-foot-wide
shoulders. The reduction in travel lanes resulted from a joint study with
the
City of Philadelphia, which determined that two travel lanes in each
direction
on the bridge would be more consistent with the Passyunk Avenue corridor.

The bridge was built in 1983. The steel-girder bridge has 18-spans,
including
the one-span drawbridge section. The bridge is 2,240 feet long and 92 feet
wide. It carries an average of 20,800 vehicles a day.

Buckley and Company Inc., of Philadelphia, is the general contractor on the

$33,527,470 project. Construction is expected to finish in late 2018. The
project is financed with 80 percent federal and 20 percent state funds.

Motorists can check conditions on more than 40,000 roadway miles by
visiting
www.511PA.com. 511PA, which is free and available 24 hours a day, provides
traffic delay warnings, weather forecasts, traffic speed information and
access
to more than 770 traffic cameras.

511PA is also available through a smartphone application for iPhone and
Android
devices, by calling 5-1-1, or by following regional Twitter alerts
accessible
on the 511PA website.

For more PennDOT information, visit www.penndot.gov. Follow Local PennDOT
Information on Twitter at www.twitter.com/511PAPhilly, and follow the
department on Facebook at
www.facebook.com/pennsylvaniadepartmentoftransportation and Instagram at
www.instagram.com/pennsylvaniadot.

To view a complete list of District 6 News Releases: Click
http://www.penndot.gov/RegionalOffices/district-6/Pages/allnews.aspx

To unsubscribe click
http://www.dot.state.pa.us/PennDOT/Districts/d6media.nsf/unsubscribeform?OpenForm

No comments:

Post a Comment