PennDOT - District 6 News
Paving, Bridge Repair Continue at Night Next Week on I-476, I-76 in Delaware, Montgomery Counties
King of Prussia, PA – The Pennsylvania Department of Transportation (PennDOT) announced today that construction activities will continue next week on Interstate 476 and on I-76 (Schuylkill Expressway) under a $63.7 million project to resurface, repair and improve nearly 17 miles of I-476, the associated on-and-off ramps and bridges from I-76 (Schuylkill Expressway) in West Conshohocken Borough, Montgomery County, to I-95 in Ridley Township, Delaware County.
Motorists are advised of the following travel restrictions:
- Monday, November 4, through Friday, November 8, from 8:00 PM to 5:00 AM the following morning, a lane closure will be in place on sections of northbound and southbound I-476 between the I-76 and I-95 interchanges for paving, bridge repair, and guiderail installation.
- Monday, November 4, through Friday, November 8, from 8:00 PM to 5:00 AM the following morning, a lane closure will be in place on eastbound and westbound I-76 (Schuylkill Expressway) between Matsonford Road and I-476 for bridge repair.
Motorists are advised to allow extra time when traveling through the work areas because significant backups and delays will occur. All scheduled activities are weather dependent.
Under this resurfacing and bridge repair project, PennDOT's contractor will mill and overlay I-476 travel lanes and shoulders in both directions; perform repairs on 49 structures; improve 21 stormwater management basins to address existing rock slope stabilization issues; repair existing sound walls; replace inlets at select locations; and install new pavement markings, delineators, rumble strips, signage and guiderail.
The purpose of this project is to extend the design life and improve ride quality and safety of the interstate and improve the current condition of roadside elements such as stormwater basins, drainage inlets, slope stabilization, guiderail and signs that are in poor condition.
H&K Group, Inc. of Skippack, PA, is the general contractor on this project, which is financed with 100 percent federal funds. Physical construction on the project is expected to finish in late 2025.
Motorists can check conditions on major roadways including color-coded winter conditions, by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information, and access to more than 1,000 traffic cameras. 511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional X alerts.
For a complete list of construction projects impacting state-owned highways in Bucks, Chester, Delaware, Montgomery, and Philadelphia counties, visit the District 6 Traffic Bulletin.
Subscribe to PennDOT news and traffic alerts in Bucks, Chester, Delaware, Montgomery, and Philadelphia counties at www.penndot.pa.gov/District6.
Information about infrastructure in District 6, including completed work and significant projects, is available at www.penndot.pa.gov/D6Results. Find PennDOT's planned and active construction projects at www.projects.penndot.gov.
Find PennDOT news on X, Facebook, and Instagram.
MEDIA CONTACT: Brad Rudolph, bradrudolph@pa.gov
# # #
Please note: you are receiving this email because you have subscribed to receive updates for District 6 News on the PennDOT website. To unsubscribe, or to find additional subscriptions available from the Commonwealth of Pennsylvania, please click the Manage Subscriptions link below.
Manage Subscriptions
No comments:
Post a Comment